News
Major construction works along M3-A14, to impact traffic at Ebène
Major traffic changes are expected in the Ebene cyber city area with the construction of the new interchange along M3-A14 corridor (Flyover Ebène project).
The Ebène Flyover project, currently being undertaken by the Road Development Authority (RDA), is expected to improve traffic flow along M1 and M3 motorway and at Ebène Cybercity roundabout; eliminate bottleneck on the A14 Road and decrease the travel time for incoming traffic in the Ebène region.
In the 20 years of its existence, Ebène has undergone a considerable urban expansion with major developments around the Cybercity, resulting in dense traffic and traffic congestions, particularly during peak hours.
Hence, the Flyover from the M3 towards Ebène will be be converted into a triple carriageway (three lanes in both directions), bypassing the roundabout to lead directly to the A14 road that leads to Rose Hill.
Slip lanes are being envisaged to facilitate exits inside and outside of Ebène onto the Flyover, and also along the M1.
A bell shape roundabout will also be constructed at the junction with the M3.
Source: GIS Mauritius